RECOVERING ENERGY
FROM WASTE pLASTICS

THE PROCESS

We’re Changing the Way the World Thinks About PLASTIC WASTE

OUR TECHNOLOGY is a novel breakthrough process for generating drop-in replacement fuels from waste materials. The process converts waste plastics into ASTM quality diesel fuel oils suitable for boilers, generators, and off-road diesel engines .

THE 
TECHNOLOGY

our Technology begins with  a pyrolysis  process followed by a series of patented low cost cracking, anti-coking, and de-waxing

catalysts efficiently breaking down and converting the plastic polymers to a diesel grade fuel oil.

THE COMPANY

Regen Fuels and Energy, llc and our partners have currently installed more than  20 applications in seven countries around the world. The first pre-commercial scale facility in North America was installed in Jacksonville, FL. The first commercial scale facility in North America was constructed in 2023 and commissioned in 2024, in Puerto Rico. Several US facilities will be coming online in 2025.

Annually, the global population generates a staggering 300 million tons of plastic waste, with estimates of only 10-20% being recycled. The remaining majority finds its way to incineration plants, landfills, or even worse, our precious natural environments. It is imperative that we put an end to this unsustainable practice.

IMG_8506.HEIC

WHY REGEN

A different approach, using a new method we like to call upcycling.

Our innovative method of upcycling challenges traditional norms, paving the way for a more efficient, sustainable, and cost-effective future. with our groundbreaking technology, we are reshaping the waste plastic landscape, offering unprecedented flexibility and scalability to meet diverse industry demands.

ReGen In Numbers

15

sites under development

7

countries

INDUSTRY

Our Top 

ReGen Sites

Our global presence is a testament to our commitment to making a positive impact on a worldwide scale. By being present in multiple regions, we embrace cultural diversity and build lasting relationships with local stakeholders, allowing us to address global challenges with tailored solutions

3rd generation unit installed in Puerto Rico 2022. Will be upgraded to 4th Generation reactor with delivery of the 2nd unit, a 4th Gen in early 2025.

Site 1

1st Generation Unit Jacksonville, FL commissioned in 2016, De-commissioned in 2024 to make way for a 4th generation unit in 2025.

Site 4

Newest 4th Generation, 10 unit install in South Korea to be commissioned January 2025.

EXPANSION

We are looking for opportunities for additional sites throughout the United States and beyond